Electromech Twitter Electromech Facebook

Load Bank Testing


Electromech offer periodic load bank testing of power generation equipment. This enables the efficiency and duty of the equipment to be monitored, and the performance of the equipment recorded throughout the load bank testing regime.

When load bank testing is undertaken, Electromech record all true RMS three phase measurement of: Voltage (V), Frequency (Hz), Current (A), Power (both kW & kVa) and Power Factor (cos) within a detailed report upon completion.